Standard
Core interlocking block for stacked retaining walls and heavy-duty barriers.
Price on request
B2B Concrete Products
Blocks
Sizes and weights from the block list. Price on request.
Core interlocking block for stacked retaining walls and heavy-duty barriers.
Price on request
Flat top surface for caps, finished wall tops, and pads.
Price on request
Half-width interlocking block for corners, curves, and tight layouts.
Price on request
Half-height lock top for stacked walls and barriers.
Price on request
Bench-style block for seating walls and stepped profiles.
Price on request
Lock-top transition for stepped walls and slope work.
Price on request
Block calculator
Units: 2.5 ft × 2.5 ft × 5 ft
—
In BC, a retaining wall 1.2 m (4 ft) or taller usually needs a permit and an engineer.
How it works
Send the blocks, the address, and when you need them. You reach the people who count the wall and send the truck.
Block choice, course height, and flat tops are settled before the truck is loaded, so the load that shows up is the load the wall needs.
A B train carries up to 95,000 lb. A shorter truck is used when the site is tight. A crane is a separate charge when your crew cannot offload.
Delivery
Per load, from the job-site address. Every city in BC is a delivery. Text the address and we will price that trip.
Reviews
“B2B is the Amazon of Concrete Blocks, 2 hrs later I had all the blocks from 3 trucks and a Crane to place them.”
John
“Super Knowledgeable and Fast”
Kim
“Forget the other guys, when you want a wall built with no BS call B2B.”
Drako
FAQ
Those are names people use for interlocking concrete blocks. The shapes we sell are the ones on the blocks page: standard, flat top, transitions, half widths, half heights, benches, and corners.
In BC, a retaining wall 1.2 m (4 ft) or taller usually needs a permit and an engineer. The calculator shows that note when the wall is two courses (5 ft) or taller.
Tell us if your crew can unload. If you can, leave the number we should call when the truck arrives. If you cannot, a crane is arranged, and that charge is separate from the haul.
Delivery brings the load to the job site. Pickup is on the order when the site cannot take a truck.